Fire Damage Repairs, PAE Government Services Project
Description of Project:
TW was involved in replacing and repairing the brick wall, gate, pavements, guard-box, lighting, cameras and associated electricity services at the Baghdad Embassy Compound.
We relocated the water supply and constructed a concrete reinforced wall in two sections divided by an entrance driveway with a steel vehicle entrance gate and a smaller pedestrian gate with pavements. We fabricated a metal entrance gate, metal pedestrian gate and “Y” shaped barbed wire brackets for the top of the wall. The existing guard-box was refurbished with opening windows, interior and exterior paint and a new A/C unit. Barbed wire was then fitted to the entire wall and gates utilising the fabricated “Y” brackets.
Contract Date: June 2018 – July 2018
Contract Value: $75,264.00
Location: BEC, Baghdad, IRAQ
Reference Name: Ganesan Rajamani
Ref Contact: Ganesan.Rajamani@pae.com
Project:
To manufacture and install containerised shelter/office buildings for the US Military located in the military zone of the Baghdad Diplomatic Security Center (BDSC), Iraq.
Duration: 2 Months
Contract Value: $132,000
Location: Baghdad, Iraq
Scope of Works:
-
Manufacture of 4 portable office buildings (containerised shelter type) 12 m x 6 m x 3 m high.
-
All management, labour, equipment, supplies, facilities, transportation, tools, materials and supervision were supplied.
-
Delivery/installation of the buildings to the BDSC.
-
Installation of Doors, windows, emergency lighting and electrical sockets, interior and exterior lighting, furniture and air conditioning units.