Project:

TW were tasked with supplying 4 x (20m x 40ft long) storage shelters covered with fire retardant fabric. They needed to be fully enclosed - the front fitted with a roll-up vehicular door and a single pedestrian entrance door. 

Duration: 2 Months
Contract Value: $210,000
Location: Baghdad, Iraq

 

Scope of Works:

  • Full architectural design carried out by our in-house engineering team and approved by the customer

  • TW performed all structural calculations, which were then approved by the Iraqi Engineers Association

  • Metal personnel door, 8.8 metre metal roll-up door and specialist fire-retardant fabric sourced, procured, and delivered internationally  

  • TW's specialist fabrication facility procured all materials and fabricated the framework in sections for simple, no welding, erection

  • Delivered in ‘kit-form sections’ to the secure OMSS site in the BDSC, Baghdad along with a full instruction manual for assembly.

Storage Shelter-2.png
20x40 Storage Shelter_Crop.jpg
Storage Shelter-3.png.JPEG
Armag Armory.png

Armag Armoury Project

TED171~1_edited.jpg

Tennis Court Resurfacing,

US Embassy, Baghdad

Fire Damage Repairs.png

Fire Damage Repairs

Sun Shade_HVAC.png

Sun-Shade and HVAC

SOW for Office Floor Plan .jpg

Outdoor Lighting and Office Refurb

Concrete Crack.jpg

Taxiway Repairs

Concrete_2.jpg

Concrete Pier

T-Walls.jpg

T-Wall Installation

Taji_Shade_Completed_edited.jpg

Taji Shade Structures

Electric%20Gate_edited.jpg

Electric Gates

Batch Plant_BDSC.png

Concrete Batching Plant

Turf_2.png

Soccer Field Turf Replacement

bottom of page