Fire Damage Repairs, PAE Government Services Project
Description of Project:
TW was involved in replacing and repairing the brick wall, gate, pavements, guard-box, lighting, cameras and associated electricity services at the Baghdad Embassy Compound.
We relocated the water supply and constructed a concrete reinforced wall in two sections divided by an entrance driveway with a steel vehicle entrance gate and a smaller pedestrian gate with pavements. We fabricated a metal entrance gate, metal pedestrian gate and “Y” shaped barbed wire brackets for the top of the wall. The existing guard-box was refurbished with opening windows, interior and exterior paint and a new A/C unit. Barbed wire was then fitted to the entire wall and gates utilising the fabricated “Y” brackets.
Contract Date: June 2018 – July 2018
Contract Value: $75,264.00
Location: BEC, Baghdad, IRAQ
Reference Name: Ganesan Rajamani
Ref Contact: Ganesan.Rajamani@pae.com
Project:
TW were tasked with supplying 4 x (20m x 40ft long) storage shelters covered with fire retardant fabric. They needed to be fully enclosed - the front fitted with a roll-up vehicular door and a single pedestrian entrance door.
Duration: 2 Months
Contract Value: $210,000
Location: Baghdad, Iraq
Scope of Works:
-
Full architectural design carried out by our in-house engineering team and approved by the customer
-
TW performed all structural calculations, which were then approved by the Iraqi Engineers Association
-
Metal personnel door, 8.8 metre metal roll-up door and specialist fire-retardant fabric sourced, procured, and delivered internationally
-
TW's specialist fabrication facility procured all materials and fabricated the framework in sections for simple, no welding, erection
-
Delivered in ‘kit-form sections’ to the secure OMSS site in the BDSC, Baghdad along with a full instruction manual for assembly.