Fire Damage Repairs, PAE Government Services Project
Description of Project:
TW was involved in replacing and repairing the brick wall, gate, pavements, guard-box, lighting, cameras and associated electricity services at the Baghdad Embassy Compound.
We relocated the water supply and constructed a concrete reinforced wall in two sections divided by an entrance driveway with a steel vehicle entrance gate and a smaller pedestrian gate with pavements. We fabricated a metal entrance gate, metal pedestrian gate and “Y” shaped barbed wire brackets for the top of the wall. The existing guard-box was refurbished with opening windows, interior and exterior paint and a new A/C unit. Barbed wire was then fitted to the entire wall and gates utilising the fabricated “Y” brackets.
Contract Date: June 2018 – July 2018
Contract Value: $75,264.00
Location: BEC, Baghdad, IRAQ
Reference Name: Ganesan Rajamani
Ref Contact: Ganesan.Rajamani@pae.com
Project:
Full office refurb including the outdoor installation of lights and fans in the Souk shops.
Duration: 3 Weeks
Contract Value: $8,050
Location: BEC, Baghdad
Scope of Works:
-
Outdoors:
• Installation outside of 28 double LED light and 6 ceiling fans according to the provided electrical plan drawing
• Run new metal and flexible conduits from the main source located behind the Souk to the new lights and fans
• Full electrical installation followed by testing of outdoor work.
-
Indoors:
• Run plastic conduits on walls, supply electricity source from 2 existing outlets
• Run metal conduit on the floor, fixed by anchor bolts and run electricity cables through them to supply each desk
• Run separate plastic conduit on the floor in between the desks and run internet cable (for the phones) to reach each one of the 8 desks
• Install sockets and ethernet outlets on the side walls
• Relocate all furniture and tidy area.
Armag Armoury Project
Tennis Court Resurfacing,
US Embassy, Baghdad
Fire Damage Repairs