Project:

Full office refurb including the outdoor installation of lights and fans in the Souk shops.

Duration: 3 Weeks
Contract Value: $8,050
Location: BEC, Baghdad

 

Scope of Works:​​​

  • Outdoors:
    • Installation outside of 28 double LED light and 6 ceiling fans according to the provided electrical plan drawing 
    • Run new metal and flexible conduits from the main source located behind the Souk to the new lights and fans 
    • Full electrical installation followed by testing of outdoor work.

  • Indoors:
    • Run plastic conduits on walls, supply electricity source from 2 existing outlets
    • Run metal conduit on the floor, fixed by anchor bolts and run electricity cables through them to supply each desk
    • Run separate plastic conduit on the floor in between the desks and run internet cable (for the phones) to reach each one of the 8 desks
    • Install sockets and ethernet outlets on the side walls
    •  Relocate all furniture and tidy area.

Armag Armory.png

Armag Armoury Project

TED171~1_edited.jpg

Tennis Court Resurfacing,

US Embassy, Baghdad

Fire Damage Repairs.png

Fire Damage Repairs

Sun Shade_HVAC.png

Sun-Shade and HVAC

Concrete Crack.jpg

Taxiway Repairs

20x40 Storage Shelter_Crop.jpg

Storage Shelter 20m x 40ft

Concrete_2.jpg

Concrete Pier

T-Walls.jpg

T-Wall Installation

Taji_Shade_Completed.jpg

Taji Shade Structures

Electric%20Gate_edited.jpg

Electric Gates

Batch Plant_BDSC.png

Concrete Batching Plant

Turf_2.png

Soccer Field Turf Replacement

bottom of page