Project:

TW designed and constructed a reinforced concrete slab and foundations along with a structural steel overhead cover for a 60 metric tonne prefabricated armoury building. The project required installation of a positive drainage system and 110V 60 Hz electrical connection. 

Duration: 4 months

Contract Value: $80,000

Location: Baghdad, Iraq

 

Scope of Works:

  • Reinforced concrete foundations

  • New septic tank

  • All Drainage

  • Overhead cover

  • All infrastructure requirements. 

Electric%20Gate_edited.jpg

Electric Gates

Batch Plant_BDSC.png

Concrete Batching Plant

Turf_2.png

Soccer Field Turf Replacement

Concrete_2.jpg

Concrete Pier

Taji_Shade_Completed.jpg

Taji Shade Structures

Sun Shade_HVAC.png

Sun-Shade and HVAC

SOW for Office Floor Plan .jpg

Outdoor Lighting and Office Refurb

Concrete Crack.jpg

Taxiway Repairs

20x40 Storage Shelter_Crop.jpg

Storage Shelter 20m x 40ft

TED171~1_edited.jpg

Tennis Court Resurfacing, US Embassy, Baghdad

Fire Damage Repairs.png

Fire Damage Repairs

T-Walls.jpg

T-Wall Installation

bottom of page